SITE NOTES: Prefabricated floor and roof cassettes were used saving time and cost. The composite floor joists and flooring reduced the amount of steelwork required and allowed easier routing of services. The pre-insulated roof cassettes were delivered to site as completed units and craned into place ready for the zinc covering. Off-site design and production promoted accuracy and reduced site tolerances.